Ocfa station 41 taxiway replacement

Orange County Fire Authority Station 41 Awarded J&L Constructors, Inc. The Contract to replace taxiway b at Fullerton airport. The project includes the demo and repurposing of 1 acre of asphalt, the export of 700 tons of existing soil, the import of 1000 tons of class to base, the trenching and installation of two sets of electrical conduit, the demo and fabrication of a fuel cell enclosure, as well as the installation of three new helicopter pads with striping and zoning for Blackhawk helicopters. Final Stages will conclude with 2-3 inch lifts of asphalt, paving, and striping.